The investment comprised constructing of storage building made of steel structure of 3 264 m2 in floor area and a brick and reinforced concrete office and worker building 690 m2 in floor area. An outside drainage system with a rain pumping station was installed, together with a numer of installations inside: water and sewage, central heating, technological heating and a mechanical ventilation system with 4 central ventilation units of a total efficiency of 17300 m3/h. The investment also comprised fitting the buildings with an indor and outdoor electrical installation together with a replacement of a 630 kVA transformer. The grounds around the investment were developed, with maneuvering areas and paving stone access roads of a total area of 1 685 m2, car parks of a total area of 760 m2 and 330 mb long fencing with two automatic gates.